All the postings of mine in this whole site is posted by some one else in the net everywhere. All copyrights remain the properties of their respective owners.
Friday, August 6, 2010
Thursday, July 29, 2010
Discovery
Pre-Flight Activities, Rarely Seen by the General Public
These photos deserve a wide viewing audience: the amount of thought and engineering that goes into every launch is immense; each successful take-off represents the Mankind's finest effort, and is a wonder to behold.
These photos deserve a wide viewing audience: the amount of thought and engineering that goes into every launch is immense; each successful take-off represents the Mankind's finest effort, and is a wonder to behold.
External tank arrives by barge from Louisiana:


External tank approaches Vertical Assembly Building (VAB):

Removing external tank:




Preparing to lift the tank to vertical:

Lifting the tank:

Solid rockets are attached:

Orbiter: External tank with Solid Rocket Boosters (SRB):

Engines are attached to the shuttle in the Orbiter Processing Facility:




Shuttle in sling ready for lift in VAB:

Shuttle has been moved to VAB and will be attached to external tank:


Shuttle is attached:




Payload Preparation in Space Station Processing Facility:


Multi-Purpose Logistics Module (MPLM):

Payload carrier leaves Canister Rotation Facility:


Payload being moved to Launch Pad:


Lifting payload into position for insertion into "Discovery"
when it arrives at the pad:



Shuttle "Discovery" leaves VAB:


Trip to launch:
Length - 3 1/2 mi
Time - 6-8 hours
Arrow indicates the Launch Pad.


Crawler Control


"Discovery" arrives at Pad:

Payload is also inside the Launch Pad:




Ready for Launch:

We Have Lift Off !

External tank approaches Vertical Assembly Building (VAB):
Removing external tank:
Preparing to lift the tank to vertical:
Lifting the tank:
Solid rockets are attached:
Orbiter: External tank with Solid Rocket Boosters (SRB):
Engines are attached to the shuttle in the Orbiter Processing Facility:
Shuttle in sling ready for lift in VAB:
Shuttle has been moved to VAB and will be attached to external tank:
Shuttle is attached:
Payload Preparation in Space Station Processing Facility:
Multi-Purpose Logistics Module (MPLM):
Payload carrier leaves Canister Rotation Facility:
Payload being moved to Launch Pad:
Lifting payload into position for insertion into "Discovery"
when it arrives at the pad:
Shuttle "Discovery" leaves VAB:
Trip to launch:
Length - 3 1/2 mi
Time - 6-8 hours
Arrow indicates the Launch Pad.
Crawler Control
"Discovery" arrives at Pad:
Payload is also inside the Launch Pad:
Ready for Launch:
We Have Lift Off !
Subscribe to:
Posts (Atom)